The Fenway Garden Society's calendar had a Grill Day at the Victory Gardens on October 12, followed by a community participation day on October 17. Boston Parks and Recreation scheduled construction on the Back Bay Fens Pathways Improvements to begin that same week, with the first phase centered around the gardens.

That timing was the plan. The city's October 2026 construction update says Phase 1 is "focused around the Victory Gardens this fall in order to avoid work during prime gardening season." Of everything published about this $6.3 million project, that sentence is the clearest piece of scheduling. Most of the other dates have moved at least once. The gardening season hasn't. If you walk, run or bike the Fens, the plot calendar is a better guide to where crews will be than any project timeline.

The Few Things the City Has Committed To

The October update is two pages long. Its commitments are short:

  • Construction starts the week of October 12.
  • Staging goes on the basketball courts for the full length of the project.
  • Work is phased so the whole park is never closed at the same time.
  • Project manager Lauren Bryant will share updates as work moves to new areas.

The Boston Sun reported the same points on October 9, attributing them to Bryant. The Muddy River Movement Management Organization repeated them on October 12. None of the three includes a map of which paths close in which phase, how long a phase lasts, or when a given section reopens. As of the October update, the basketball courts are the one spot with a known role for the whole project, as the construction staging area.

The firm part of the plan is the sequence. Work focuses around the gardens outside prime gardening season, then moves elsewhere. Everything else depends on how quickly each phase finishes.

What the Gardens Get When the Crews Leave

Gardeners get more than a construction window, since the Victory Gardens carry some of the most specific changes in the design record. At a community meeting on November 15, 2023, the design team from Kyle Zick Landscape Architecture answered a series of garden questions, and the meeting notes list the commitments:

  1. The planned drinking fountain moves from the Boylston Street and Park Drive sidewalk to the central lawn and gets a bottle filler.
  2. The vehicle route gets curb ramps at both ends.
  3. Gardeners can still drive on interior paths. Vehicles are restricted only at the Boylston Street pedestrian entrance.
  4. Trash receptacles on the central lawn will be the Parks Department standard, replacing the steel barrels.
  5. A bike rack will be added for the gardens.
  6. A group of trees along the path near the river will be protected during construction.

The same plans include a new accessible path to the publicly accessible plots, and an accessible bulletin board near the proposed path to the Herb and Medicinal Garden. One garden request went the other way. People had seen more elaborate entry designs, and the team chose the simplest option as "the most in keeping with the character of this historic park," while saying it would look at adding seating.

All of this comes from design-phase documents that are almost three years old. The October 2026 update confirms where Phase 1 is happening. It doesn't confirm which of these details made it into the final construction drawings.

The Rest of the Park, as Drawn in 2023

When the work leaves the gardens, the 2023 schematic shows what's planned for the rest of the Fens. New or repaved asphalt paths would generally run 9 to 10 feet wide. The path near the Rose Garden would widen to 12 feet, and a 10-foot connection would link the Evans Way Bridge to Jersey Street. The plan adds new light fixtures, drinking fountains, bike racks and benches, along with shrub removal, lawn renovation, new trees and riverbank plantings. Some of the accessible routes call for 12-foot paths with handrails and regrading of existing paths, while other stonedust paths were labeled to stay as they are or to be rebuilt by the Army Corps. The Fenway News described the work in September 2025 as path reconstruction with infiltration trenches and drainage structures, which matters in a park that floods along the Muddy River edge.

The 2023 notes also record several specific decisions:

Spot What the 2023 plans say
Benches parkwide Armrests, backs, and a companion space to the side
Proposed meadow The three existing willow oaks stay
Stone seatwall near Agassiz Road and the Fenway Removed; designers determined it is not historic
Robert Burns memorial Seating locations under review
Path closest to the Muddy River No benches yet; more options once the temporary Muddy River project fence comes down
War Memorial area 12-foot path, shrub removal, new and replacement memorial lighting

The O'Reilly Memorial shows how ownership limits what the project can do. The Fenway Civic Association helped secure funding there for improved access, uplighting and landscaping. In 2023 the design team said landscaping was under consideration, but uplighting would require a friends group able to maintain it. The cobrahead light belongs to the state Department of Conservation and Recreation, so the city project can't replace it. Cyclists welcomed one change in that spot, the removal of the granite pavers on the O'Reilly sidewalk. The park dates to 1877 and falls under the Boston Landmarks Commission, which helps explain why "simplest" and "in keeping with the character" keep coming up in the design answers.

The Bridge Is the Part Still Being Designed

Of everything in the project, the Evans Way Bridge is the least settled. At a community meeting on October 9, 2024, the proposed replacement was described as fully accessible and pedestrian-only, but built to carry emergency vehicles. Some vegetation would be cleared, with no large trees removed. Wood was ruled out because of its short life and maintenance needs, and the group leaned toward a hybrid of traditional and modern styles. Color and final design were left for later. The Boston Sun's coverage of that meeting reported a 10-foot minimum width and a six-foot elevation change that the accessible design has to handle. It also reported that the bridge schedule depended on design and fundraising.

So the bridge runs on a different track from the pathways. The 10-foot path to Jersey Street in the 2023 schematic leads to a crossing whose final form hadn't been chosen as of the latest public record.

A Start Date That Moved Twice

The project's history is why the gardening calendar is the more reliable guide.

When it was said Where Construction start target
November 15, 2023 Design update presentation Spring 2024
October 9, 2024 Evans Way Bridge meeting notes 2025
October 2026 City construction update Week of October 12, 2026

The project page still lists 2026 as the expected completion year, next to a line saying construction begins in fall 2026. Work was scheduled to begin the week of October 12. A phased rebuild across a park this size, with a garden phase timed to the off-season, makes a finish within the same calendar year hard to square with the city's own description. The page's completion field looks like a holdover. Treat it that way until a newer update replaces it.

The gardens are a fixed reference point because their schedule doesn't depend on permitting or fundraising. Prime gardening season comes back every spring, so the work around the plots has a natural deadline whether or not any other date holds.

Where Updates Will Come From

The October update names the channels. Bryant is listed as the project contact at [email protected], and the city says she will post updates as work moves. Non-emergency park issues during construction go to 311. The project page carries the construction updates along with every design presentation and set of meeting notes back to October 2022, so you can check a planned feature against the latest version before assuming it will be built. The page also lists the Fenway Civic Association and the Emerald Necklace Conservancy among the groups working with the Parks Department.

For now, staging on the basketball courts and Phase 1 around the Victory Gardens are the announced start of a project whose later phases haven't been scheduled publicly. The next official update should come when crews move out of the gardens.

If you own a home near the Fens and want to know how park work and timelines like this one could affect your property, Colin Bayley and the Bayley & Natoli team can talk it through with you. Request a Home Valuation & Market Plan to get a current read on your home.

Colin Bayley

Colin Bayley

About The Author

Colin is known for personalized service, honest advice, and results that speak for themselves. His approach is both high-touch and highly effective—valuing long-term relationships over transactions and offering clients the kind of market insight and exclusive access that only deep local experience can provide.

With a focus on Boston’s most sought-after neighborhoods and suburbs—including Back Bay, Beacon Hill, the South End, Seaport, Cambridge, Brookline, and Newton—Colin represents developers, investors, landlords, and luxury buyers with the same level of care and precision. His trusted network, strategic marketing expertise, and command of market data consistently deliver exceptional results across both on- and off-market opportunities.

Whether it’s the charm of a historic brownstone or the elegance of a contemporary penthouse, Colin’s discretion, professionalism, and genuine commitment to his clients have made him a respected name in Greater Boston’s luxury real estate market.

Work With Colin

Your goals become mine — whether repositioning your listing for top dollar or guiding you through a competitive buyer’s market, I provide focused advocacy every step of the way.
Let's Connect
Follow Us